Hydro-generator Overhaul
Quartzelec acting as lead contractor delivers the total refurbishment of Unit 1 at a hydro-electric power station, managing all electrical and mechanical aspects
READ MOREQuartzelec acting as lead contractor delivers the total refurbishment of Unit 1 at a hydro-electric power station, managing all electrical and mechanical aspects
READ MOREQuartzelec delivers a smart lighting solution design to optimise energy efficiency and operational costs at 25 NHS community health facilities across the Northwest, UK
READ MORECritical upgrade of HV/LV infrastructure, overcoming existing limitations and enhancing system reliablity to ensure a dependable power supply
READ MOREQuartzelec delivers a fully compliant lightning protection scheme, installing an isolated system with three, 10m masts within identified compound
READ MOREQuartzelec supports refurbishment of 133 modern apartments in residential complex
READ MOREQuartzelec enables hospital to maintain full operational status whilst 996 RAAC panels are replaced in one of first NHS upgrades
READ MOREQuartzelec supports full LV supply cable alteration works following significant water ingress damage
READ MOREQuartzelec installs LV supply to enable generator connection for intrusive switchgear maintenance programme
READ MOREQuartzelec provides onsite LV final circuit testing for Group 2 | 1 | 0 medical locations
READ MOREQuartzelec delivers a full M&E solution within a 20-week schedule to ensure swift re-location of the Merseyside Police
READ MOREQuartzelec undertakes intrusive switchgear maintenance supplying key, critical locations within the hospital as part of a planned preventative maintenance programme
READ MOREQuartzelec utilises full capabilities to upgrade pumping station in Doncaster, improving flood risk management effectiveness and site safety in the process
READ MOREQuartzelec undertake the EICR of a large manufacturing plant in North Manchester
READ MOREEmpowering communities with expert M&E Solutions, Quartzelec’s latest triumph at Gorton Community Hub sees a full M&E installation which included HV/LV power and systems, HVAC, drainage, lighting schemes and security systems
READ MOREMajor components fabricated for multiple energy storage systems to be used to support a high-profile, global off-road electric racing project
READ MOREQuartzelec delivers on this significant re-generation scheme undertaking the full BNO and M&E elements to all landlord areas servicing residential apartments as well as key communal areas
READ MOREQuartzelec assists a large North West Hospital back up to full power following failure of an ageing LV Air Circuit Breaker which left power supply on-site at only 60%
READ MOREMajor Overhaul at a Hydro Generating Station
READ MOREReplacmenet Excitation system at a Waste Management Service Provider
READ MORENew Build M&E engineering contract for Bardsley Construction
READ MOREMaintenance & Testing Services Government Pipelines & Storage Systems
READ MORELV Modernisation Works: Scotland, North-West England and Wales
READ MOREStator re-conditioning and rotor rewind of Generator for EDC - Manila, Philippines
READ MOREDesign and manufacture of replacement DC winder motor, Queensland, Australia
READ MOREHV/LV Installation for Wrightington, Wigan & Leigh NHS Foundation Trust
READ MORE